The construction site for the coastal park on Via Nizza is expected to start in the next few weeks and the company responsible needs spaces to temporarily store materials needed for the works.
For this reason, Palazzo Sisto has requested the concession of space in the former shipyards of Solimano overlooking the beach, which Fresia will grant on loan free of charge, of a conditional nature.
Its area is approximately 2,000 square meters within the former shipyards in Solimano, for the period from the date of signing the agreement until March 31, 2025, and is subject to renewal by agreement between the two parties.
The municipality will have to clean and remove vegetation that hinders the safe exploitation of the area; Making fences to fill the access gaps to the buildings and maintaining the existing fences of the areas along the entire waterfront.
The beach promenade will be built in four sections of Via Niza beach: between the former baths, Playa and Las de Zenola, 180 meters long; For a distance of 253 meters between the Quattro Stagioni River and the Molinero Stream; The third part, between the San Cristoforo Stream and the Corsaro Baths, is 345 meters long and between the San Antonio Baths and the Umberto Baths, with a length of 49 meters on columns and 67 meters on concrete.